Duty Roster
Your Help is Needed!
It will take lots of volunteer help to make a launch this big a success.
and
are our Chief Range Safety Officers (RSO) and Launch Control
Officers (LCO). We can all do our part by signing up for a period of
duty. If you're up to the task (Level 2 Certification or better), e-mail
and sign-up.
We will need two RCOs and LCOs for each time period on
Friday and Saturday. Any blanks in the tables below need a volunteer.
If you are not Level 2 certified you can act as an assistant LCO (it's
a great way to learn more about rocketry). Thanks in advance to everyone
who can help.
Check the bottom of this page for a description of RCO and LCO duties
and qualifications.
Sign up now, we need
the help!
Thursday October 2
| Times |
Launch Control Officer | Range
Safety Officer |
| 1-2
PM | |
|
|
2-4 PM | |
|
| 4-6 PM | |
|
| 6-8 PM |
|
|
| 8-10 PM | | |
Friday October 3
| Times |
Launch Control Officer | Range
Safety Officer |
| 7-10
AM | |
|
|
10-12 AM |
|
|
| 12-2
PM |
|
|
|
2-4 PM |
|
|
| 4-6 PM | |
|
| 6-8 PM |
|
|
| 8-10 PM |
|
|
Saturday October 4
| Times |
Launch Control Officer | Range
Safety Officer |
| 7-10
AM | |
|
|
10-12 AM |
|
|
| 12-2 PM |
|
|
| 2-4 PM |
|
|
| 4-6
PM |
|
|
|
6-8 PM |
|
|
| 8-10 PM | | |
Sunday October 5
| Times |
Launch Control Officer | Range
Safety Officer |
| 7-8
AM |
|
|
|
8-10 AM | |
|
| 10-12 AM | | |
| 12-1 PM | | |
Range Safety Officer
The RSO (Range Safety Officer) is responsible for range
safety. The RSO checks that the rocket is flight worthy and proper
construction techniques have been used and a proper motor has been
selected. RSO must be NAR and/or Tripoli Level 2 certified.
Launch Control Officer
The LCO (Launch Control Officer) is responsible for
checking that the range and sky are clear. LCO or his assistant makes
launch announcements. The LCO makes sure that the sequence and flow
of launches goes smoothly. LCO must be NAR and/or Tripoli Level 2
certified.